Atkinson Construction

I-405 112th St SE to SE 8th Street Widening Design Build

Location
Bellevue, WA

Owner
Washington State Dept of Transportation

Contract Price
$124,000,000

Completion
2008

Description

The South Bellevue Widening project will improve one of the worst congestion chokepoints along the I-405 corridor, improve safety, increase travel speeds during peak commuter hours, improve freight movement throughout the corridor, and implement meaningful environmental improvements. 

This project includes:

  • One southbound lane from SE 8th Street to I-90, to include the removal of the Wilberton Tunnel.
  • One northbound lane from 112th Avenue to SE 8th Street.
  • A new northbound structure over Coal Creek Parkway.
  • A new three-lane southbound bridge over I-90 to the west of and adjacent to the existing southbound bridge.
  • Converting the existing southbound structure to a northbound HOV lane.
  • Installing quieter pavement along the project limits as part of a test project to test its durability, quality and quantity of noise reduction as well as how its noise suppression abilities perform over time.
  • A new ramp meter at 112th Ave SE, and
  • Enhanced stormwater management facilities.