Client
Sound Transit
Completion Date
2022
Designer
H-J-H Final Design Partners, a JV
Location
Bellevue, Washington
Delivery Method
General Contractor/Construction Manager (GCCM)
Division
Northwest
Contract Value
$418 million
This project includes 1.9 miles of the new rail alignment through downtown Bellevue including at-grade track, track within a tunnel, elevated track guideway, retained cut/fill segments, and a major cast-in-place segmental bridge over I-405. The four stations are located at East Main St., NE 6th Street (Bellevue Transit Center), Wilburton, and 120th Street. Work also included the north tunnel portal, utilities, civil systems infrastructure, and 0.4 miles of storage track in BNSF right of way.