E335 Downtown to Spring District

Client

Sound Transit

Completion Date

2022

Designer

H-J-H Final Design Partners, a JV

Location

Bellevue, Washington

Delivery Method

General Contractor/Construction Manager (GCCM)

Division

Northwest

Contract Value

$418 million
elevated light rail tracks heading into the downtown bellevue station

This project includes 1.9 miles of the new rail alignment through downtown Bellevue including at-grade track, track within a tunnel, elevated track guideway, retained cut/fill segments, and a major cast-in-place segmental bridge over I-405. The four stations are located at East Main St., NE 6th Street (Bellevue Transit Center), Wilburton, and 120th Street. Work also included the north tunnel portal, utilities, civil systems infrastructure, and 0.4 miles of storage track in BNSF right of way.